Kitchen renovation electrical work: what’s involved

· 3 min read · Fins Up Electrical, licence 91921

5.0 on GoogleLicence 91921Open 24 hours, Mon to SatFree quotes

Electrical work in a kitchen renovation happens in three stages: disconnecting the old kitchen safely, roughing in new cables while the walls are open, and fitting off points, lights and appliances once the cabinets and benchtops are in. Along the way the electrician checks the switchboard can take new circuits for the oven, cooktop and other heavy loads. All of it has to be done by a licensed electrician in Queensland.

What happens at the start of a kitchen renovation?

Before demolition, an electrician disconnects and makes safe the old oven, cooktop, rangehood, dishwasher, lights and power points. Cables left in the wall get terminated safely so the demo crew isn’t swinging a hammer near live wires. This is also when we look at the switchboard and the existing circuits, because what we find there shapes the rest of the job.

What gets decided at rough-in?

Rough-in is when the cables go in, after demolition and before new plaster and splashback. Bring the cabinet maker’s drawings. Every point is set out from them:

  • Bench power points spaced along the bench and in the island.
  • Dedicated points for the fridge, dishwasher and microwave.
  • The oven and cooktop circuits, sized to the appliances you’ve chosen.
  • The rangehood point, up high inside the canopy or cupboard.
  • Lights: downlights, pendants over the island, LED strip under the overheads or in the kickboards.
  • Switches, including which lights go on which switch.

Pick your appliances before rough-in if you can. The cooktop in particular decides the circuit size. Induction cooktops usually need a larger circuit than old electric ones.

Will the kitchen need new circuits?

Often. Modern kitchens run more high-draw gear at once: air fryers, coffee machines, kettles, induction cooktops. A single power circuit feeding the whole kitchen trips. Splitting the bench points over more than one circuit fixes that.

If you’re swapping gas cooking for electric, you’ll need a new oven or cooktop circuit from the switchboard. That needs space on the board.

Under-cabinet LED strips and rangehoods are small loads, but they still need points or drivers placed where they can be reached later. Hiding a driver behind a fixed panel makes a simple fault a big job. We plan an access spot for each one.

Do I need to upgrade my switchboard for a new kitchen?

Sometimes. In Queensland, when power and lighting circuits are added, they need safety switch protection. Older boards often have ceramic fuses, no spare room, or no safety switch on some circuits. The Electrical Safety Office recommends safety switches on every circuit, including the oven. A kitchen renovation is often the right time to sort the board out, before new circuits go on it. See switchboard upgrades.

What happens at fit-off?

Once the cabinets, benchtops and splashback are in, the electrician comes back to fit the power points, switches and lights, and connect the oven, cooktop and rangehood. Hardwired appliances must be connected by a licensed electrician. Then everything gets tested, including the safety switches.

Pendant lights are a common last-minute job. Fins Up Electrical installs kitchen pendants regularly. Set the height once the island stools are in, so they’re clear of heads but still light the bench.

How do I keep the electrical side on schedule?

Book the electrician when you book the cabinet maker. Agree the dates for disconnect, rough-in and fit-off against the rest of the trades. A missed rough-in means a waiting plasterer and a delayed tiler.

Fins Up Electrical does kitchen and renovation electrical work across the Redcliffe peninsula and Moreton Bay, for homes and for shops and offices. Andrew works to your program and quotes free and fixed before any work starts. Licence 91921. See renovations and fit-outs and oven and cooktop installation.

Want this sorted? Renovation electrical from Fins Up.

Licensed electrician, licence 91921. Free quote before any work starts. Open 24 hours Monday to Saturday.

Common questions

Can I do the electrical work in my own kitchen renovation?

No. In Queensland all electrical work, including power points, lights and appliance connections, must be done by a licensed electrician.

When should the electrician start in a kitchen renovation?

Before demolition, to disconnect the old kitchen safely. Then at rough-in once the walls are open, and again at fit-off.

Do I need to choose appliances before rough-in?

It helps. The oven and cooktop decide the size of their circuits, and the fridge and microwave locations decide where their points go.