A home EV charger has to be installed by a licensed electrician to the Australian wiring rules (AS/NZS 3000), usually on its own circuit with safety switch protection. The electrician also has to check your switchboard and the supply to the house can take the extra load. In south east Queensland, Energex sets the network rules, and from 1 October 2026 it dropped the old requirement for single-phase chargers over 20 amps to be load managed.

What standard covers EV charger installation?

The wiring rules, AS/NZS 3000, cover the electrical installation in your home, and that includes the circuit feeding an EV charger. Energex says single-phase charging equipment can be installed in line with AS/NZS 3000. The charger maker’s install manual also sets what the circuit, protection and mounting must be.

In practice that means a dedicated circuit sized to the charger, the right safety switch protection, a suitable isolation point, and cable sized for the load and the length of the run.

Does my switchboard and power supply need checking?

Yes, and this is the part that most often changes the job. A 7 kW single-phase charger pulls a lot of current for hours at a time. Energex requires electrical contractors to assess how the charger adds to the home’s maximum demand, and whether the existing installation or protection needs to change.

If the assessed demand goes over the rating of your service fuse, Energex may need to upgrade the supply, and extra charges from the network can apply. On older homes, the switchboard may also need room for a new circuit or a safety switch upgrade. See switchboard upgrades.

What changed with Energex rules in October 2026?

When the Queensland Electricity Connection Manual version 4 came out in February 2024, single-phase chargers rated over 20 amps at most homes had to be managed connections. That meant a controlled load tariff or a network device that let Energex limit the charger.

From 1 October 2026, Energex withdrew that clause. EV chargers no longer need those active management controls. Existing setups with a network device keep working, and owners can have an electrician rewire the charger and lodge a request to remove the device if they want. Maximum demand and phase balancing rules still apply.

Single-phase or three-phase: which do I need?

Most homes are single-phase, and a single-phase wall charger covers what most drivers need overnight. If your home already has three-phase power, a three-phase charger can charge faster. Energex notes a 22 kW (32 amps per phase) three-phase charger is an option at three-phase premises. Not every car can take that rate, so check your car’s onboard charger first.

If you have three-phase and fit a single-phase charger, it has to meet the phase balancing rules in the connection manual.

Can I charge from a normal power point instead?

Energex says you can charge from a 10 or 15 amp power point, as long as the existing installation is suitable. It’s slow, but fine if you drive short distances. The point should be in good condition, protected by a safety switch, and not shared with a pile of other loads. If the car will charge off a power point every night, have the circuit checked first.

What about vehicle-to-home or vehicle-to-grid?

Bidirectional chargers that send power from the car back to the house or the grid are a different category. Energex requires approval through a connection application before one is installed. Allow time for that.

Who can install an EV charger?

A licensed electrician. In Queensland, all electrical work must be done by someone licensed for it. Fins Up Electrical installs home EV chargers across the Redcliffe peninsula and Moreton Bay, checks your demand and switchboard, and handles the paperwork with Energex. Andrew quotes free and fixed before any work starts. Licence 91921. See EV charger installation.

Want this sorted? EV charger installation from Fins Up.

Licensed electrician, licence 91921. Free quote before any work starts. Open 24 hours Monday to Saturday.

Common questions

Do I need approval from Energex to install an EV charger?

Your electrician lodges the required paperwork with Energex. Vehicle-to-grid chargers need a connection application approved before install.

Is there still a 20 amp limit on EV chargers in Queensland?

Energex withdrew the managed connection rule for single-phase chargers over 20 amps from 1 October 2026. Maximum demand and phase balancing still apply.

Does an EV charger need its own circuit?

A wall charger normally runs on its own dedicated circuit, sized to the charger and protected as the wiring rules and maker’s instructions require.